土木与环境工程学报

Pre-grouting for Leakage Control and Rock Improvement

Abstract

Subash TR, Abhilash Urs KR, Ananth M and Tamilselvan K

In underground construction, ground water inflow and rock mass stability has been a challenging problem. Especially the tunnels constructed below ground water table are often exposed to risk of ground water inflow. Protection of underground structures against water ingress and rock mass failure is of paramount importance during construction as well as operation of the tunnel. Risks associated with these hydrogeological issues often pose challenge to tunneling engineers. Mitigation of these risks by means of pragmatic measures such as pre-grouting can improve the rock mass strength and restrict the water ingress to acceptable levels. The primary purpose of pre-grouting is to improve the rock mass strength and establish an impervious zone around the tunnel periphery, thus leading to reduced support system and permeability of rock mass. The aim of this article is to discuss the concept of pre-grouting as an effective mitigation measure for leakage control and rock mass improvement which is being successfully implemented in many countries.

免责声明: 此摘要通过人工智能工具翻译,尚未经过审核或验证

分享此文章

索引于

相关链接

arrow_upward arrow_upward